Linde Engineering Efficiency Across Project Lifecycle

Linde Engineering reduced estimating variability from 60% to 15% by adopting ACCE. They reduced their total number of estimating tools from 25 to 6.  They have integrated ACCE with 3D modeling to track project costs through detailed design and construction effectively.