The refining market is ever evolving due to market trends continuously changing. Typically, refiners use spreadsheets to develop a schedule, but are often limited to time-based scheduling due to spreadsheet limitations. In Aspen Refinery Multi-Blend Optimizer, schedulers use rundown components continuously, while respecting tank inventories and constraints, to generate a refinery-wide blend schedule on a single database. Download this white paper to learn more today!